{"id":45982,"date":"2014-09-03T17:38:12","date_gmt":"2014-09-03T15:38:12","guid":{"rendered":"https:\/\/test.steinmuehle.de\/blog\/2014\/09\/03\/during-the-vacation-construction-work-was-carried-out-both-inside-and-outside\/"},"modified":"2026-06-18T15:42:21","modified_gmt":"2026-06-18T13:42:21","slug":"during-the-vacation-construction-work-was-carried-out-both-inside-and-outside","status":"publish","type":"post","link":"https:\/\/steinmuehle.de\/en\/blog\/2014\/09\/03\/during-the-vacation-construction-work-was-carried-out-both-inside-and-outside\/","title":{"rendered":"During the vacation, construction work was carried out both inside and outside"},"content":{"rendered":"<p>During the summer break, the <b>sports and recreation area<\/b> between the gym and Centrum 5\/6 underwent a thorough renovation, resulting in a new fitness trail in front of Centrum 5\/6 and new playing fields in front of the gym. Although a new drainage system had to be installed, the facility will be ready for use again by the start of the school year. <\/p>\n<p>But work was also underway indoors, especially in <b>the entrance hall of the main building<\/b>. Thanks to the hard work our custodians put in over the break, the entrance area is now brighter and more inviting. <\/p>\n<p><a href=\"https:\/\/steinmuehle.de\/wp-content\/uploads\/2014\/09\/K1024_Neubau2014_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3376\" src=\"https:\/\/steinmuehle.de\/wp-content\/uploads\/2014\/09\/K1024_Neubau2014_2-202x300.jpg\" alt=\"K1024_New Construction 2014_2\" width=\"202\" height=\"300\"><\/a> <a href=\"https:\/\/steinmuehle.de\/wp-content\/uploads\/2014\/09\/Neubau2014_3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3377\" src=\"https:\/\/steinmuehle.de\/wp-content\/uploads\/2014\/09\/Neubau2014_3-300x186.jpg\" alt=\"New Construction 2014_3\" width=\"300\" height=\"186\"><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During the summer break, the sports and recreation area between the gym and Centrum 5\/6 underwent a thorough renovation, resulting in a new fitness trail in front of Centrum 5\/6 and new playing fields in front of the gym. Although a new drainage system had to be installed, the facility will be ready for use [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"give_campaign_id":0,"footnotes":""},"categories":[86,85],"tags":[],"class_list":["post-45982","post","type-post","status-publish","format-standard","hentry","category-archive","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/posts\/45982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/comments?post=45982"}],"version-history":[{"count":1,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/posts\/45982\/revisions"}],"predecessor-version":[{"id":48969,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/posts\/45982\/revisions\/48969"}],"wp:attachment":[{"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/media?parent=45982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/categories?post=45982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/steinmuehle.de\/en\/wp-json\/wp\/v2\/tags?post=45982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}